Day 23: Yesterday was a slow day. Our electrician worked all day to get the beast up and running, but it ended up a larger job than originally anticipated. He had to snake new wires, conduit, and mount all three of these controls. So here are the pictures, The first is the Beast with the Power throw, Overload protector, and variable speed control for the agitator. Second is a detail of those controls without the covers. Next is the electrician finishing up. Fourth is the electrician showing us all how the new control set up works and what order to properly run them in. It is hard to tell, but in the down time I made a few other connectors for things like the CO2 vent, put valves on some of the open pipes on lid of the beast. They were not very big or flashy, but fun to put together. It is a bit rewarding to know things I did are now a part of this machine for a long time. It's exciting to myself in the position of using this first after the overall and install.





No comments:
Post a Comment